7.02.2011

HOUSE UPDATE--{rollin' the floor}


A lot has happened with the house these last few weeks:
  1. stem walls poured
  2. damp proofing applied
  3. foundation back-filled
  4. trenches dug
  5. utilities connected and inspected
  6. floor sheeted



This is my most recent picture of the place. 

And actually, it doesn't even look like this anymore. As we speak, Andrew, his brothers, and his dad are framing up the walls. It's all happenin' FAST

I. AM. SO. EXCITED.




No comments:

Related Posts Plugin for WordPress, Blogger...